Penthouse Tel Aviv, Israel | February 2009 First fix lighting schematics. On foreign projects It is essential that correspondence is maintained with constant reporting back from site by way of comments
Penthouse Tel Aviv, Israel | November 2008 First fix shell; View through Reception
Hacienda, Patagonia, Argentina | October 2009. First fix wiring commences in line with Base Build Structure
Hacienda, Patagonia, Argentina | October 2009. External view of hacienda
Fairlight Gallery | August 2008 Render showing proposed interior (courtesy Bentheim Design)
Fairlight Gallery | August 2008 Render showing proposed interior (courtesy Bentheim Design)
Private Villa, Portugal | April 2010 - New build private villa in the south of Portugal with a contemporary lighting scheme including full site control system.
Private Villa, Portugal | April 2010 - New build private villa in the south of Portugal with a contemporary lighting scheme including full site control system.
Private Residence, Oxfordshire | March 2010 - All lighting will be concealed in fit out design (for Adrian James Architects, Oxford)
Private Residence, Oxfordshire | March 2010 - Fluid architecture for an open plan house with projecting first floor (for Adrian James Architects, Oxford)
Private Residence, Petworth | October 2008 Enabling works. At this point we can survey the existing structure to assess mechanical conflicts. This enables us to check feasibility of cable runs and limitations on light fittings based on available space
Private Residence, Petworth | September 2008 Front elevation
Porto Montenegro, Tivat | October 2008 Night time view of the pier showing lit palm trees and the linear fibre optic system. Completion date is programmed for 2102
Porto Montenegro, Tivat | October 2008 Daytime view of the lighting in the planters.
Porto Montenegro, Tivat | August 2008 Here a bench with concealed LED lighting is demonstrated during a mock up. Other features have concealed lighting such as fountains and service pods
Porto Montenegro, Tivat | July 2008 The largest marina in Europe is under way and the scheme has now been demonstrated by a full size prototype to one of the temporary piers. Here the apertures in the granite border to the planters can be clearly seen into which the buried uplighters are to be mounted