profile
team
portfolio
in progress
awards
editorial
projects

IN PROGRESS

The gestation time of the projects on which we are working can be anything up to 5 years.  Here we  give an insight to a few recent projects, and some projects which are currently ongoing. 

We manage our projects with continuous site attendance to ensure that all aspects of the implementation are correctly carried out to satisfaction.

 

Formentor, Mallorca, Spain

£6 million project due for completion in 2008

 

….the bar is set to raise a rung or two higher with the launch last week of a newly built house. The house is an awesome glass edifice. Entered on the second level, the floor-to-ceiling Schucco glass doors on the double height living room open out across an Ipe decked terrace and directly over the bay of Formentor.

Country Life International, July 2008

 

 

July 2008

View from Living room out to sea over Pool Deck

 

June 2008

View over Pool Deck with waterfall

 

May 2008

Project nearing completion; view through Living Room over Pool Deck

 

9 May 2007

Base-build Structure completed.  View from Master Bedroom

 

 

6 February 2007

Excavation of Mountain bedrock completed. 

Max oversees progress of the base build with the site agent

 

 

6 February 2007

Foundations go in.  Setting out under way

View out to sea from what will be the first floor

 

 

 

30 January 2006

CAD representation of the final facade, detailing Deck and Pool

 

 

 

____________________________________________________________________

 

 

Chateau Puyvigier, Bordeaux, France

Bespoke 4 metre high Ceramic Chandelier due for completion in 2007

 

            

16 December 2006

The indefatigable John working through the night.

"  I would rather be potholing!"

 

 

____________________________________________________________________

 

Victoria & Albert Museum, Stained Glass Galleries

Daylight & Artificial light is employed to illuminate exhibits against windows

 

         

30 October 2005

Left: Mock up detailing backlit glass exhibit using LEDs and scrim

Right: Installation of Frames for mounting Stained Glass

 

 

____________________________________________________________________

 

National Grid Power Station, Control Room

Bespoke uplighting rig - 4 lamp colours sequenced through a satellite time clock

 

       

28 September 2001

Off site mock-up of Lighting Rig

 

           

2 August 2003

Left: Warm lamps predominate at a lower lighting levels in the evenings

Right: Daylight simulation with cooler lamps at full output

 

 

____________________________________________________________________